Our Projects: Broadmere Primary Academy, Toilet Refurbishment

The girls and boys toilets at Broadmere Primary Academy have been completely refreshed for the new 22/23 school year.

The refurbishment began with the strip out and decommissioning of the existing girls’ toilet and adjacent storage area to form separate boys’ and girls’ toilets with new openings to the corridor. Each space has brand new floors, wall and ceiling finishes, complete with new cubicles and trough sinks in lagoon and lime green colours.

Synergy’s Building Surveying team completed this project on time during the summer holidays, ensuring minimum disruption to the school as possible.

  • Client: Bourne Education Trust
  • Sector: Education
  • Services: Building Surveying
  • Contract: £110K

< Back to projects