Watford Grammar School for Boys, STEM Centre

Client: Watford Grammar School for Boys

Contract: £3 million

Heavily oversubscribed the school identified the need to address the shortfall in Sixth Form teaching spaces. With the assistance of the Synergy team, the school submitted a successful CIF bid to part fund a new STEM centre.

The new three-storey building was designed to enhance connections between Science, Technology, Engineering and Mathematics recognising the excellent reputation of these subjects within the school and the high proportion of A-level students who continue to study STEM related degrees at University.

On the second floor, the building has a superb conference area to allow for more outreach work with local schools and industry. On the first floor there are six mathematics teaching rooms. On the ground floor there is a science lab and engineering suite with a large CAD/CAM area significantly upgrading the School’s current facilities.

<

Back to projects