Our Projects: Epsom and Ewell High School, Toilet Refurbishment

The refurbishment of the students and staff toilets at Epsom & Ewell High School were completed over the Summer Holidays 2017 and funded by the Bourne Education Trust’s School Condition Allocation (SCA).  

The project  comprised alteration and refurbishment to the existing boys and girls toilets to form a new open plan gender-neutral toilet facility.  Staff toilets were also refurbished as part of the project.
The works included the full refurbishment of all areas including new suspended ceilings, energy efficient LED lighting, new cubicles, vanity units, sanitary ware, floor coverings as well as the installation of new shower cubicles within the staff toilets.

The project also included the replacement of defective crittal framed single glazed windows and doors with new double glazed powder coated aluminium units, and the installation of a fully designed mechanical extraction system to improve air quality within the toilets.

  • Client: Epsom and Ewell High School
  • Sector: Education
  • Services: Building Surveying
  • Contract: £170,000

< Back to projects